Control of Process Trajectory for avoiding failures and operational constraints

 

Client: Research Institute of Petroleum Industry

Date: 2009-2010

Director project: Dr. Babak Tavassoli

Project type: Simulation study

Project collaborator: K.N. Tossi University of Technology (KNTU)

Summary of project:

This project was a part of a larger collaborative research on real-time optimization (RTO) of a Hydrodesulphurization (HDS) plant which is normally cascaded with the control system. An RTO system optimizes the plant performance by adjusting the setpoints of the closed loop controller in real-time, i.e. during the operation of the plant. To achieve the benefits of the RTO system it is required that the control system provides an acceptable performance to eliminate oscillations and transient errors as much as possible. In this project, the model predictive control algorithm was utilized for this purpose.

 
 
 
 
 
 